1923
|
Office of Secretary PWD and Chief Engineer was transferred from Allahabad to Lucknow.
|
|
1924
|
‘United Provinces Engineers' Association was formed by departmental engineers at Kanpur on May ‘06.
|
|
1927
|
Public Health Department was established separately from PWD and its control was given to Civil Council.
|
|
1931
|
Railway operations were taken out from the PWD.
|
|
1933
|
Mr. Rai Bahadur Chhuttan Lal was appointed as the first Indian Chief Engineer.
|
|
1938
|
Irrigation works were taken out from PWD and Irrigation Department established.
|
|
1941
|
After the above mentioned restructuring, the PWD was left with only 01 Chief Engineer, 02 Superintending, Engineers and 07 Executive Engineers.
|
|
1944
|
Due to World War II the pace of works under the Military Engineering (M.E.S.) increased and from 1944-45 there were 02 Chief Engineers, 05 Superintending Engineers and 22 Divisional Officers.
|
|
1945
|
Thomson Engineering College Roorkee was again brought under the control of the department.
|
|
1946
|
A research institute was also set up under the department.
|
|
1947
|
After independence, the name of the province became Uttar Pradesh.
|
|
1948
|
Thomson Engineering College Roorkee was made a university and brought under the control of education department.
|
|
1963
|
Departmental Construction Unit (D.C.U.) was established on an experimental basis to carry out works directly under departmental engineers.
|
|
1965
|
Housing Development Board was established to speed up the housing schemes of government.
|
|
1970
|
Rural Engineering Service and Minor Irrigation Department were established to give acceleration rural development.
|
|
1972
|
Uttar Pradesh State Bridge Corporation established for the speedy construction of bridges.
|
|
1972
|
L.S.G.E.D. was renamed to Jal Nigam.
|
|
1976
|
Based on the success of the Bridge Corporation, U.P. Rajkiya Nirman Nigam was established for building construction on departmental pattern, and it added to the glory of the state in the area of building construction.
|
|
1976
|
The State Electricity Board was constituted for electricity production and distribution. In Irrigation Department 'Tube well Corporation’ was formed. In Jal Nigam Construction & Design Services was formed for consultancy.
|
|
1980
|
Four Zonal offices namely Western, Central, Eastern and Hill region, Meerut was created for speedy and better supervision under chief engineers with head quarter at Meerut, Lucknow, Varanasi and Garhwal respectively.
|
|
1983
|
Chief Engineer (Building) was posted for the building works under department in November.
|
|
1985
|
Gorakhpur zone was created with headquarter at Gorakhpur from Eastern region Varanasi in the month of February.
|
|
1985
|
Chief Engineer (National Highway) was posted for National Highway Works with P.W.D. under State In June.
|
|
1985
|
Northwest zone with headquarter at Bareilly from Western zone and South-Central zone with headquarter at Kanpur from Central zone was created in June.
|
|
1987
|
Chief Engineer (E/M) was posted for procurement and maintenance of departmental machineries required for construction and supervision works in August.
|
|
1987
|
Jhansi zone from South-Central zone, Agra zone from Northwest zone and Faizabad zone from Gorakhpur zone was created and Chief Engineers were posted in September.
|
|
1990
|
The name Sarvajanik Nirman Vibhag was changed to Lok Nirman Vibhag in April.
|
|
1990
|
A post of Chief Engineer (Level-1) was created at the headquarters Lucknow for monitoring works of the externally aided World Bank (road project) in December.
|
|
1990
|
Legal Cell established in all Zonal Chief Engineers’ Office in October.
|
|
1994
|
Chief Engineer (Complain) was posted in November.
|
|
1996
|
The posts of Managing Director of UP Rajkiya Nirman Nigam and Bridge Corporation were reserved for Chief Engineer of PWD (Level-2) in March.
|
|
1996
|
Moradabad zone (from Northwest zone) and Allahabad zone (from South central Zone) were established in newly created revenue commissionaires in August.
|
|
2000
|
As a result of the formation of Uttarakhand state, the Garhwal and Kumaon regions were transferred to Uttrakhand with proportionate posts and the hill cadre was abolished from department.
|
|
2001
|
For PMGSY works dedicated divisions were named as per the requirement of Government of India in January.
|
|
2005
|
Engineer-in-Chief for Development Rural Roads, Designs and Planning were posted for speedy and better monitoring the Engineer-in-Chief Development also nominated as H.O.D.
|
|
2008
|
Two temporary posts of Chief Engineer (Level-2) in PWD created in August.
|
|
2013
|
Chief Engineers were posted on the Indo-Nepal border in September.
|